At a dental school, we resealed 150 feet of failing terminations and repaired 20 square feet of blistered and split modified bitumen membrane with new cap sheet. Educational facilities—especially those with precision equipment like dental schools—can’t afford water infiltration that could damage technology or disrupt training. Addressing failing sealants and membrane damage before leaks develop protects both the expensive equipment inside and the students learning to serve their future patients.
Project Profile
| Item | Description |
|---|---|
| City | Greenville |
| State | NC |
| Industry | Education |
| Service | Leak Repair |